Skip to main content
All articles

Site Operations

Pricing coordinator time: how to negotiate partial FTE support without burying staffing in procedure fees

By Julio G. Martinez-Clark Published November 24, 2026 Updated November 24, 2026 5 min read

Why staffing disappears inside procedure fees

A full-time equivalent (FTE) is a unit of staffing: one FTE is one person working full time, and a partial FTE is a defined fraction of that person's time charged to a study. Sites often skip pricing that fraction explicitly. Instead, coordinator time is folded into per-procedure or per-visit fees, on the assumption that visit revenue will cover the people who run the visits.

That assumption fails in negotiation. Procedure fees are the line sponsors discount first, because they are easy to compare across sites. When the fee comes down, the staffing cost does not come down with it — the coordinator still screens, schedules, documents, and answers queries for the same number of hours. The site has effectively agreed to fund its own staffing out of a shrinking margin, and there is no line in the budget to point to when the shortfall appears.

A separate, named staffing line avoids that trap. It can be discussed, adjusted, or defended on its own terms, instead of being silently compressed every time a procedure fee is negotiated.

Price the work, not the headcount

The version of this ask that sponsors accept is built from work, not from a headcount request. "We need half a coordinator" is easy to refuse, because it describes a person. A workload build describes tasks the protocol itself creates:

  • Hours per visit type. Estimate coordinator time for each visit the protocol requires — screening, enrollment, follow-up, and unscheduled visits do not take the same time.
  • A defined share for startup. Site initiation, training, and regulatory preparation happen before the first participant is seen, and they consume coordinator hours that no visit fee has yet paid for.
  • A defined share for queries and closeout. Data queries arrive after visits, sometimes long after, and closeout work continues after the last visit. If the budget only funds visit days, that work is unfunded by design.

When the FTE request is presented as the sum of those named blocks of work, the conversation changes. The sponsor is no longer being asked to fund overhead; it is being shown what its own protocol requires, priced in hours.

Tie partial support to enrollment milestones

A common sponsor concern is open-ended staffing: a fixed FTE charge that continues whether the study enrolls or not. Tying partial FTE support to enrollment milestones answers that concern without giving the line away.

Under that structure, the level of funded coordinator time steps with enrollment activity the sponsor can verify — for example, a base level during startup, and higher support as screening and enrollment reach agreed levels. The site is protected because the support grows with the work; the sponsor is protected because it is not paying full staffing for a study that has not started enrolling.

The milestones, the support level at each step, and the review point should all be written into the budget exhibit, so neither side has to renegotiate mid-study when enrollment changes pace.

Split one coordinator across studies — in writing

At most sites, one coordinator supports several studies, often within the same therapeutic area. Charging each study the full cost of that coordinator would be wrong, and sponsors know it. The credible approach is to split the FTE across the studies by expected hours and put the split in writing.

That written split does three things. It shows each sponsor it is paying only for its share. It shows the site, in one place, whether the coordinator's total allocated time exceeds the time actually available — an early warning that is otherwise discovered as missed visits and late data entry. And it gives both sides a clean basis for adjusting the split when one study's workload rises or ends.

What to settle before signing

Before signing, a site should be able to point to five things in the budget:

  • Coordinator time appears as a separate, named line, not inside procedure fees.
  • The line is built from workload: hours per visit type, plus defined shares for startup, queries, and closeout.
  • Partial FTE support is tied to enrollment milestones, with the step levels written down.
  • Any coordinator shared across studies is split by expected hours, and the split is documented.
  • A review point is named for adjusting support when enrollment pace changes materially.

None of this asks a sponsor to pay for time the study does not use. It asks that the time the study does use be visible, priced, and agreed before the work starts.

How this works in practice

At Amavita Research, our Miami cardiovascular trial site, we care for more than 18,000 active cardiology patients, and our record includes zero Food and Drug Administration (FDA) Form 483 findings. Staffing is part of how that record is kept: coordinators who are funded for the full workload a protocol creates — not only its visit days — are the ones who can keep screening, documentation, and query turnaround from slipping when a study gets busy. Pricing that time openly, as a named line tied to named work, is better for the sponsor as well: it knows exactly what support it is funding and what that support covers.

Julio G. Martinez-Clark is chief executive officer (CEO) of Amavita Research Services, a Miami cardiovascular trial site, and CEO of bioaccess, a first-in-human contract research organization (CRO).

Next step

Sponsors: see what Amavita Research can run

Amavita Research is a Miami cardiovascular trial site with 18,000+ active cardiology patients and zero United States Food and Drug Administration (FDA) Form 483 findings. See our site capabilities or talk with our sponsor team.

By Julio G. Martinez-Clark · Last updated November 24, 2026. This article is site-operations education and is not medical advice or a regulatory recommendation.